Roads By Council

Report generated on Fri, September 24 2021 at 10:39:42 AM


Tamworth Regional Council

Closed

1.  Cherry Street, Barraba (Closed)

Cherry Street - road works - closed 11am 09/09 to 2pm 10/09 (Closed)
Road will be closed between Rodney St and Henry St, from 11am 09/09 to 2pm 10/09 for drainage works. Local access only.

2.  Dean Street, North Tamworth (Closed)

Dean Street / Johnston St intersection closure - 7am-4pm 11/09 (Closed)
Dean St will be single lane traffic going north (up the hill), with the work zone closing the south bound lane at the Johnston St intersection. No access to Johnston St east or west. Traffic control & detours will be in place.

3.  Dewhurst Street, Manilla (Closed)

Dewhurst Street - section closed under bridge 24/05-31/08 (Closed)
Section of street will be closed underneath Manilla Bridge, to allow major repairs to the bridge. Road expected to be closed until 31/08/2021. Detours will be in place.

4.  Evans Street Westdale (Closed)

Evans Street - closed at railcrossing - 27/08 - 6.30am-5pm (Closed)
Evans St will be closed Friday, 27/08, 6.30am to 5pm for road widening works within the rail corridor. No access from Wallamore Road.

5.  James Street, Moonbi (Closed)

James Street - closed at creek - surface damage (Closed)
Closed at the creek crossing, due to surface damage from wet weather. Detour via Goal Creek Road or New England Gully Road.

6.  Johnston Street, North Tamworth (Closed)

Johnston/Dean Street intersection closed - 7am-4pm, 11/09 (Closed)
Johnston St will be closed at the Dean St intersection for Dean St upgrade works. Traffic control & detours in place. Please allow extra travel time.

7.  Piper Street (Closed)

Piper Street - between Hunt and Dean Street - closed 20/09 to 21/09 (Closed)
Piper Street will be closed between Hunt and Dean Street 20/09 to 21/09 for water main works - traffic control and detours will be in place. Please allow extra time for travel.

8.  Wallamore Road, Westdale (Closed)

Wallamore Road - Tangaratta causeway closed (Closed)
15/08 - causeway demolition begun, works will take 3 months. Detours in place.

Wallamore Road - APA gas flare operations 09/09 onwards (Caution)
02/09 - APA advise that intermittent gas flare events will re-commence from 09/09, for several weeks, daylight hours only. Enquiries to APA Group.

Wallamore Road - Evans Street corner - roadworks - 23/08 (Roadworks)
Major roadworks on Wallamore Rd opposite Evans St. Work will take approximately 4 days, expect delays, some lengthy. Please take alternative routes. Tangarrata causeway still closed.

Caution

1.  Arthur Street, Manilla (Caution)

Arthur Street - low level bridge open (Caution)
New low level bridge now open. Road approaches to bridge programmed for repair later this year. Please drive with care.

2.  Goddard Lane - Westdale (Caution)

Goddard Lane / Wallamore Road - APA gas flare events (Caution)
APA advise they will be carrying out gas flare events from 11/06/2021 for several weeks, daylight hours only. Enquiries to APA Group.

Roadworks

1.  Calala Lane, Calala (Roadworks)

Calala Ln / Campbell Rd roundabout construction - 31/05 - 29/10 (Roadworks)
10/09 - construction progressing, under traffic control, please allow extra travel time. Changed conditions next 2 months.

2.  Campbell Road, Calala (Roadworks)

Campbell Rd / Calala Ln roundabout construction - 31/05 - 06/10 (Roadworks)
02/09 - construction underway - Campbell Rd detours and traffic control, please allow extra travel time. Changed conditions next 2 months.

3.  Country Road, Westdale (Roadworks)
Oxley Hwy is one-way thru roundabout under traffic lights until late March 2021. Add five minutes travel time. Oversize and/or overmass (OSOM) must contact Construction Manager 0435 539 381 prior to travel. A lane width restriction of 5m is in place.

4.  Glen Barra Road, Halls Creek (Roadworks)

Glen Barra Road - maintenance grading (Roadworks)
Maintenance grading work is being undertaken this week. Please drive with care.

5.  Manilla Road, Manilla (Roadworks)
Manilla low level bridge opening ceremony 20/09 at 10am - expected to be open approx. noon. Traffic control and signage in place, please drive with care.

6.  Mt Lindsay Road (Roadworks)

Mt Lindsay Road - gravel renewal (Roadworks)
Gravel renewal work is being undertaken this week from start of gravel to Horton Falls turn off. Please drive with care.

7.  Oxley Highway West (G'dah Rd) (Roadworks)

Oxley Hwy / Country Rd intersection detours - Jan 2021-Sept 2021 (Roadworks)
Oxley Hwy is one-way thru roundabout under traffic lights until late March 2021. Add five minutes travel time. Oversize and/or overmass (OSOM) must contact Construction Manager 0435 539 381 prior to travel. A lane width restriction of 5m is in place.

8.  Palmer Road, Attunga (Roadworks)

Palmer Street - roadworks - 7am-5pm, 22/09 (Roadworks)
Roadworks will be done from Boomerang St to rear of school. Please drive with care.